South Staffordshire College - T Level Wave 5 Rodbaston Animal Care Centre

Introduction & Overview

PMc were appointed in January 2023 to support the College in putting together a funding application to the Department of Education (DfE) to construct a new T Level animal care centre as part of T Level Wave 5 capital fund. PMc worked with the College to develop the design concept, costings, programme, education case and other required documentation as part of the application. Confirmation that the application had been successful, and funding had been secured was confirmed in July 2023.

PMc were subsequently appointed by the College in August 2023 as client side Project Managers, Client Advisors, and Quantity Surveyors to deliver the project. The project was led by George Hounsome, Project Manager, with support from Matthew Elliott, Assistant Project Manager.

The project consisted of the demolition of the existing ‘end of life’ timber frame building and replaced with a stated of the art animal care teaching facility.

Key features of the build include:

  • general teaching classrooms;
  • Technology Lab;
  • Aquatic zone;
  • Animal Isolation zone and store; and,
  • Toilet and storage facilities

The project started onsite in June 2024 following the appointment of E Manton Limited. Practical completion was issued in January 2025 with the project delivered on time and on budget.

Key Facts - T Level Wave 5 Rodbaston Animal Care Centre

Heading #1
Start on Site
June 2024
Target Completion Date
January 2025
New Build Area (m²)
263m²
Total Project Budget
£1.45m
Funder
Part Funded by DfE
Architects
MCMa
MEP Consultant
mstep
Structural Consultant
Baker Chatterton Structural Design
Cost Consultants
PMc
Project Manager, Employer’s Agent & Bid writers
PMc
Main Contractor
E Manton Ltd