The Henley College - Digital Hub
Project Overview
The Henley College, a sixth form institution in Henley-on-Thames, offers diverse academic and vocational programs, including A-Levels. It fosters a mature learning environment with strong student support, focusing on preparing students for higher education, apprenticeships, or employment.
PMc was engaged by The Henley College to prepare a funding bid for the Post 16 Capacity Fund. After approval, we collaborated with an architectural designer to develop the scheme to Stage 3 for tender. A scope change led to a successful redesign of the Stage 3 pack, transforming the project into a state of the art Creative Media Hub. PMc then oversaw the entire project, from contractor selection to completion, acting as Project Managers and cost consultants. This included converting the D6 building into the Creative Media Hub, featuring a TV Studio, Photography Suite, Music Studio, and IT Classrooms. The project ran from October 2024 to April 2025, with power upgrades planned for the summer.
Key Facts
Heading #1 | |
---|---|
Start on Site | 8th October 2025 |
Completion Date | 17 April 2025
|
Refurbishment (m²) | 933m² |
Total Project Budget | £2.36m |
Funder | DfE |
Architects | APLB |
Client Advisors | PMc |
Cost Consultants | PMc |
Project Manager, Employer’s Agent, & Bid Writer | PMc |
Main Contractor | Inside Ltd |
Project Team